• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Safety Risk .net

Humanising Safety and Embracing Real Risk

Discover More on this Site

  • Home
    • About
      • Privacy Policy
      • Contact
  • FREE RESOURCES
    • FREE SAFETY eBOOKS
    • FREE DOWNLOADS
    • TOP 50
    • FREE RISK ASSESSMENT FORMS
    • Find a Safety Consultant
    • Free Safety Program Documents
    • Psychology Of Safety
    • Safety Ideas That Work
    • HEALTH and SAFETY MANUALS
    • FREE SAFE WORK METHOD STATEMENT RESOURCES
    • Whats New In Safety
    • FUN SAFETY STUFF
    • Health and Safety Training
    • SAFETY COURSES
    • Safety Training Needs Analysis and Matrix
    • Top 20 Safety Books
    • This Toaster Is Hot
    • Free Covid-19 Toolbox Talks
    • Download Page – Please Be Patient With Larger Files…….
    • SAFETY IMAGES, Photos, Unsafe Pictures and Funny Fails
    • How to Calculate TRIFR, LTIFR and Other Health and Safety Indicators
    • Download Safety Moments from Human Resources Secretariat
  • PSYCHOLOGY OF SAFETY & RISK
    • Safety Psychology Terminology
    • Some Basics on Social Psychology & Risk
    • Understanding The Social Psychology of Risk – Prof Karl E. Weick
    • The Psychology of Leadership in Risk
    • Conducting a Psychology and Culture Safety Walk
    • The Psychology of Conversion – 20 Tips to get Started
    • Understanding The Social Psychology of Risk And Safety
    • Psychology and safety
    • The Psychology of Safety
    • Hot Toaster
    • TALKING RISK VIDEOS
    • WHAT IS SAFETY
    • THE HOT TOASTER
    • THE ZERO HARM DEBATE
    • SEMIOTICS
    • LEADERSHIP
  • Covid-19
    • COVID-19 (Coronavirus) Health and Safety Slogans and Quotes for the Workplace
    • Covid-19 Returning to Work Inductions, Transitioning, Safety Start Up and Re Entry Plans
    • Covid-19 Work from Home Safety Checklists and Risk Assessments
    • The Hierarchy of Control and Covid-19
    • Why Safety Loves Covid-19
    • Covid-19, Cricket and Lessons in Safety
    • The Covid-19 Lesson
    • Safety has this Covid-19 thing sorted
    • The Heart of Wisdom at Covid Time
    • How’s the Hot Desking Going Covid?
    • The Semiotics of COVID-19 and the Social Amplification of Risk
    • Working From Home Health and Safety Tips – Covid-19
    • Covid-19 and the Hierarchy of Control
  • Dr Rob Long Posts
    • Learning Styles Matter
    • There is no HIERARCHY of Controls
    • Scaffolding, Readiness and ZPD in Learning
    • What Can Safety Learn From Playschool?
    • Presentation Tips for Safety People
    • Dialogue Do’s and Don’ts
    • It’s Only a Symbol
    • Ten Cautions About Safety Checklists
    • Zero is Unethical
    • First Report on Zero Survey
    • There is No Objectivity, Deal With it!
  • Quotes & Slogans
    • Researchers Reveal the Top 10 Most Effective Safety Slogans Of All Time
    • When Slogans Don’t Work
    • 77 OF THE MOST CLASSIC, FAMOUS and INFAMOUS SAFETY QUOTES
    • 500 BEST WORKPLACE HEALTH and SAFETY SLOGANS 2020
    • 167 CATCHY and FUNNY SAFETY SLOGANS FOR THE WORKPLACE
    • COVID-19 (Coronavirus) Health and Safety Slogans and Quotes for the Workplace
    • Safety Acronyms
    • You know Where You Can Stick Your Safety Slogans
    • Sayings, Slogans, Aphorisms and the Discourse of Simple
    • Spanish Safety Slogans – Consignas de seguridad
    • Safety Slogans List
    • Road Safety Slogans
    • How to write your own safety slogans
    • Why Are Safety Slogans Important
    • Safety Slogans Don’t Save Lives
    • 40 Free Safety Slogans For the Workplace
    • Safety Slogans for Work

Work Method Statements

Censorship and Taboos in Safety

August 23, 2020 by Dr Rob Long Leave a Comment

Censorship and Taboos in Safety

One of the interesting things we do in SPoR workshops is an audit of language, just a simple psychoanalysis of words associated with a key word. For example, ask any group what they associate with the language of ‘safety’ and … Learn more >>>>>

Please share our posts

  • Click to print (Opens in new window)
  • Click to email this to a friend (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to share on Reddit (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)

Filed Under: Robert Long, Social Psychology of Risk, Work Method Statements Tagged With: hierachy of control, ppe, swms

Ten Cautions About Safety Checklists

July 24, 2020 by Dr Rob Long 6 Comments

A checklist for checking your use of checklists 🙂

imageTen Cautions About Safety Checklists

See also: Making Objects Safe or People Safe (Dr Rob Long), Risk is About People, not just Objects (Rob Sams)

Whilst value of checklists is well documented by Gawande (The Checklist Manifesto) and others, … Learn more >>>>>

Please share our posts

  • Click to print (Opens in new window)
  • Click to email this to a friend (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to share on Reddit (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)

Filed Under: Robert Long, Safety Checklists, Work Method Statements Tagged With: desensitisation, safety checklists, swms

Work Method Statement Development Guide

July 19, 2015 by Admin Leave a Comment

imageOh dear……. this guide may excite some safety people and have given the developers a warm fuzzy feeling but it’s missing some crucial components – can you tell me what they are?

Download the Guide Here Work Method Statement Guide

Its pretty obvious what’s missing

… Learn more >>>>>

Please share our posts

  • Click to print (Opens in new window)
  • Click to email this to a friend (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to share on Reddit (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)

Filed Under: Work Method Statements Tagged With: Work Method Statements

Safety’s for sale and so is toilet paper!

January 9, 2015 by Admin 5 Comments

It hit the fan when Gab Carlton published Where To Put the Port-a-loo is a Hazard!. I wonder if there will be the same gut reaction to Keith McCabe’s latest post on LinkedIn Pulse or do “Toilet Safety Police” really have nothing to go … Learn more >>>>>

Please share our posts

  • Click to print (Opens in new window)
  • Click to email this to a friend (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to share on Reddit (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)

Filed Under: Safety Procedures, Safety Professional, Work Method Statements Tagged With: safe work procedures, safety policeman, toilet safety

Swimming Up Stream and the SWMS Dilemma

November 26, 2014 by Dr Rob Long 4 Comments

 

Refer also to: The Arse-Covering Myth

Swimming Up Stream and the Safe Work Method Statement Dilemma

work method statementI was with an organisation this week that was being inspected by the regulator. The regulator had the unenviable task of assessing whether this organisation was appropriately managing … Learn more >>>>>

Please share our posts

  • Click to print (Opens in new window)
  • Click to email this to a friend (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to share on Reddit (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)

Filed Under: Robert Long, Work Method Statements Tagged With: JHA, job hazard analysis, job safety analysis, JSA, Safe work method statement, safety documentation, safety slogan, swms, work method statement

  • Go to page 1
  • Go to page 2
  • Go to page 3
  • Interim pages omitted …
  • Go to page 7
  • Go to Next Page »

Primary Sidebar

How we pay for the high cost of running of this site – try it for free on your site

Visit Count – Started Jan 2015

  • 21,279,268 Visitors

Never miss a post - Subscribe via Email

Enter your email address and join over 30,000 other discerning safety people who receive notifications of new posts by email

Please take our 2 minute zero survey

Recent Comments

  • Rob Long on Measurement Anxiety in Safety
  • Antony on Measurement Anxiety in Safety
  • Rob Long on The Quantitative and Qualitative Divide in Safety
  • Bernard Corden on The Quantitative and Qualitative Divide in Safety
  • Bernard Corden on Are You a Safety Clown?
  • Atharva on Road Safety Slogans
  • Rob Long on It’s Always About Paperwork
  • Keith on It’s Always About Paperwork
  • Sairam on Road Safety Slogans
  • Rob Long on Merry Covid Xmas–2020

FREE eBOOK DOWNLOADS

Featured Downloads

  • Europe-SPoR-Workshop-Flyer.pdf (196 downloads)
  • Risk Assessment Template (550 downloads)
  • Blowin'-in-the-wind-03092019 (415 downloads)
  • Due-Diligence-Workshop-Nov-2018.pdf (267 downloads)
  • Falls-Risk-Assessment-Tool.pdf (1871 downloads)
  • SAFETY-SLOGANS-LIST.doc (7925 downloads)
  • Telecommuting Safety Checklist (9156 downloads)
  • Lessons-I-Have-Learnt.docx (1868 downloads)
  • Public-Event-Risk-Management-Checklist-HD.doc (953 downloads)
  • Following-Leading-in-Risk-SECTION-1.pdf (679 downloads)
  • Electrical Equipment Risk Assessment (483 downloads)
  • CLLR-SPoR-Unit1.pdf (445 downloads)
  • ABCs Of Heavy Lifting (4361 downloads)
  • Risk-Life-Poster-SPoR.pdf (295 downloads)
  • Presentation-Skills-Toolbox.pdf (440 downloads)

Recent Posts

  • The Seduction of Slogans in Safety
  • Certificate, Diploma and Masters Studies in SPoR
  • Measurement Anxiety in Safety
  • Are You a Safety Clown?
  • The Quantitative and Qualitative Divide in Safety
  • Balance in Risk and Safety
  • It’s Always About Paperwork
  • Sin-Eaters for Safety
  • Mixed Messages but No Redemption
  • The Silver Bullet

Footer

AUTHORS

  • Alan Quilley
    • Heinrich–Industrial Accident Prevention
    • The Problem With ZERO Goals and Results
  • Bernard Corden
    • AHH$ Covid$afe Chri$tma$ New$letter
    • Paradise by the dashboard light
  • Bill Sims
    • Employee Engagement: Chocolate, Vanilla, or Strawberry?
    • Injury Hiding-How do you stop it?
  • Craig Clancy
    • Task Based vs Activity Based Safe Work Method Statements
    • Safety And Tender Submissions
  • Daniel Kirk
    • It’s easy being wise after the event.
    • A Positive Safety Story
  • Dave Whitefield
    • Safety is about…
    • Safety and Compliance
  • Dennis Millard
    • Are You Risk Intelligent?
    • Honey they get me! They get me at work!
  • Drewie
    • Downturn Doin’ Your Head In? Let’s Chat….
    • How was your break?
  • Gabrielle Carlton
    • All Care and No Care!
    • You Are Not Alone!
  • George Robotham
    • How to Give an Unforgettable Safety Presentation
    • How To Write a Safety Report
  • Goran Prvulovic
    • Safety Manager – an Ultimate Scapegoat
    • HSE Performance – Back to Basics
  • James Ellis
    • In search of plan B in workers’ recovery
    • What and how should we measure to support recovery from injury?
  • James Parkinson
    • To laugh or not to laugh
    • People and Safety
  • John Toomey
    • Who is Responsible for This?
    • Who Are Your People?
  • Karl Cameron
    • Abby Normal Safety
    • The Right Thing
  • Ken Roberts
    • Safety Legislation Is Our Biggest Accident?
    • HSE Trip Down Memory Lane
  • Mark Perrett
    • Psychology of Persuasion: Top 5 influencing skills for getting what you want
  • Mark Taylor
    • Build a Psychologically Safe Workplace by Taking Risks and Analysing Failures
    • Enculturing Safety
  • Max Geyer
    • WHS Legislation is NOT about Safety it’s about Culture
    • Due Diligence Is Not Just Ticking Boxes!
  • Matt Thorne
    • It was the SIA until someone wanted to swing from the Chandelier
    • Common Sense is Remarkably Uncommon
  • Peter Ribbe
    • Is there “Common Sense” in safety?
    • Who wants to be a safety professional?
  • Phil LaDuke
    • Hey Idiots, You’re Worried About the Wrong Things
    • Misleading Indicators
  • Admin
    • Certificate, Diploma and Masters Studies in SPoR
    • Merry Covid Xmas–2020
  • Dr Rob Long
    • The Seduction of Slogans in Safety
    • Measurement Anxiety in Safety
  • Rob Sams
    • I’m just not that into safety anymore
    • Social ‘Resiliencing’
  • Barry Spud
    • Barry Spud’s Hazard Control Tips
    • Researchers Reveal the Top 10 Most Effective Safety Slogans Of All Time
  • Sheri Suckling
    • How Can I Get the Boss to Listen?
  • Safety Nerd
    • The Block isn’t portraying safety as it should be
    • Toolbox Talk Show–PPE
  • Wynand Serfontein
    • Why The Problem With Learning Is Unlearning
    • I DON’T KNOW
  • Zoe Koskinas
    • Why is fallibility so challenging in the workplace?

FEATURED POSTS

Fooled by Certainty

Understanding Habit, Habituation and Change

The Advisor as Skilled Helper

Risk and Safety Rituals

Sanctimonious Safety

Human Dymensions Newsletter September 2016

The Perils of Excessive Safety Management Systems

Psychology of Risk Post Graduate Program Suspended ‘til 2017

Semiotics and Unconscious Communication in Safety

The Attraction of Simple and Easy in Safety

Social Psychology Applied to the Discernment of Risk

The Different Levels of Wrongness!

How do we mourn?

Is Risk and Safety Perfectionism a Disorder?

Building resilience trumps the prevention of harm

Reality vs Theory, The Binary Divide

Social Sensemaking Available Now PLUS Free Share and Giveaway

Right and Wrong in Safety

The New Leadership – Risk and Safety

The Hero Myth in Modern Management

More Posts from this Category

Paperwork

https://vimeo.com/162034157?loop=0

Due Diligence

https://vimeo.com/162493843?loop=0

loading Cancel
Post was not sent - check your email addresses!
Email check failed, please try again
Sorry, your blog cannot share posts by email.