• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Safety Risk .net

Humanising Safety and Embracing Real Risk

Discover More on this Site

  • Home
    • About
      • Privacy Policy
      • Contact
  • FREE RESOURCES
    • FREE SAFETY eBOOKS
    • FREE DOWNLOADS
    • TOP 50
    • FREE RISK ASSESSMENT FORMS
    • Find a Safety Consultant
    • Free Safety Program Documents
    • Psychology Of Safety
    • Safety Ideas That Work
    • HEALTH and SAFETY MANUALS
    • FREE SAFE WORK METHOD STATEMENT RESOURCES
    • Whats New In Safety
    • FUN SAFETY STUFF
    • Health and Safety Training
    • SAFETY COURSES
    • Safety Training Needs Analysis and Matrix
    • Top 20 Safety Books
    • This Toaster Is Hot
    • Free Covid-19 Toolbox Talks
    • Download Page – Please Be Patient With Larger Files…….
    • SAFETY IMAGES, Photos, Unsafe Pictures and Funny Fails
    • How to Calculate TRIFR, LTIFR and Other Health and Safety Indicators
    • Download Safety Moments from Human Resources Secretariat
  • PSYCHOLOGY OF SAFETY & RISK
    • Safety Psychology Terminology
    • Some Basics on Social Psychology & Risk
    • Understanding The Social Psychology of Risk – Prof Karl E. Weick
    • The Psychology of Leadership in Risk
    • Conducting a Psychology and Culture Safety Walk
    • The Psychology of Conversion – 20 Tips to get Started
    • Understanding The Social Psychology of Risk And Safety
    • Psychology and safety
    • The Psychology of Safety
    • Hot Toaster
    • TALKING RISK VIDEOS
    • WHAT IS SAFETY
    • THE HOT TOASTER
    • THE ZERO HARM DEBATE
    • SEMIOTICS
    • LEADERSHIP
  • Covid-19
    • COVID-19 (Coronavirus) Health and Safety Slogans and Quotes for the Workplace
    • Covid-19 Returning to Work Inductions, Transitioning, Safety Start Up and Re Entry Plans
    • Covid-19 Work from Home Safety Checklists and Risk Assessments
    • The Hierarchy of Control and Covid-19
    • Why Safety Loves Covid-19
    • Covid-19, Cricket and Lessons in Safety
    • The Covid-19 Lesson
    • Safety has this Covid-19 thing sorted
    • The Heart of Wisdom at Covid Time
    • How’s the Hot Desking Going Covid?
    • The Semiotics of COVID-19 and the Social Amplification of Risk
    • Working From Home Health and Safety Tips – Covid-19
    • Covid-19 and the Hierarchy of Control
  • Dr Rob Long Posts
    • Learning Styles Matter
    • There is no HIERARCHY of Controls
    • Scaffolding, Readiness and ZPD in Learning
    • What Can Safety Learn From Playschool?
    • Presentation Tips for Safety People
    • Dialogue Do’s and Don’ts
    • It’s Only a Symbol
    • Ten Cautions About Safety Checklists
    • Zero is Unethical
    • First Report on Zero Survey
    • There is No Objectivity, Deal With it!
  • Quotes & Slogans
    • Researchers Reveal the Top 10 Most Effective Safety Slogans Of All Time
    • When Slogans Don’t Work
    • 77 OF THE MOST CLASSIC, FAMOUS and INFAMOUS SAFETY QUOTES
    • 500 BEST WORKPLACE HEALTH and SAFETY SLOGANS 2020
    • 167 CATCHY and FUNNY SAFETY SLOGANS FOR THE WORKPLACE
    • COVID-19 (Coronavirus) Health and Safety Slogans and Quotes for the Workplace
    • Safety Acronyms
    • You know Where You Can Stick Your Safety Slogans
    • Sayings, Slogans, Aphorisms and the Discourse of Simple
    • Spanish Safety Slogans – Consignas de seguridad
    • Safety Slogans List
    • Road Safety Slogans
    • How to write your own safety slogans
    • Why Are Safety Slogans Important
    • Safety Slogans Don’t Save Lives
    • 40 Free Safety Slogans For the Workplace
    • Safety Slogans for Work

Safe Work Method Statements after Harmonisation

September 23, 2013 by Barry Spud 3 Comments

Safe Work Method Statements after Harmonisation

We’ve been wondering how Safe Work Method Statements will be dealt with under new National WHS Legislation. Work Method Statements required under the new laws will have to comply with the new National format which, in same states, is different from current state requirements.We found a few sites that explain it better than we could:

Extract from recent post on SAFETY AT WORK BLOG:

Recently, concerns were raised over the revisions to Safe Work Method Statements (SWMS) provisions.  It was suggested that SWMS have the potential to bloat beyond several pages due to the need to include “associated risks”.  Most safety management systems and OHS professionals would already have include secondary, ancillary or associated risks as part of the job safety analyses and SWMS.

As an example of this type of discussion, WorkSafe Victoria’s comparison document of its Victorian OHS regulations to the new national draft says (Download the Comparison Document Here:   )

“The SWMS duty will expand to require all hazards, risk and controls associated with the high-risk construction work to be recorded, as the risks of the work.” [emphasis added by WorkSafe]

WorkSafe seems to consider this as a major issue as is evident from the (unnecessary) emphases in the document.  Associated risks become a minor issue some years ago when the duty of care was expanded, or clarified, to apply to visitors to workplaces.

A major risk with complicated SWMS is one that already exists and is not being adequately addressed – the cutting and pasting of SWMS that have only a tenuous relationship to the task being undertaken.  SWMS run the risk of bloating but this is more likely to occur if the role of SWMS in managing safety is poorly understood or poorly explained.  It is acknowledged by regulators that the new WHS Act and regulations will undoubtedly increase the amount of paperwork required to demonstrate compliance.  SWMS is just one part of that paperwork but a vital one, particularly in the area of contractor management…………….READ THE WHOLE POST HERE

From WORKSAFE ACT:

The requirement for a Safe Work Method Statement [SWMS] in the ACT is based on the adoption of the National Standard for Construction Work under the Work Safety Act 2008.

The Code of Practice for the Prevention of Falls in Housing Construction and the Code of Practice for the Prevention of Falls in General Construction, both of which have been adopted in the ACT and have their basis under the Standard, also require an SWMS to be developed for work at heights over 2 metres.

A Safe Work Method Statement (SWMS) documents a process for identifying and controlling health and safety hazards and risks.

An SWMS should be prepared before work begins, if anyone’s health and safety is at risk because of the work.  An SWMS can also be used for any other work activities if it is felt that it would be of use.

An SWMS is similar to a JSA.

What is a Safe Work Method Statement?

A Safe Work Method Statement (SWMS) is a document that:

  • lists the type of hazardous work being done
  • states the health and safety hazards and risks arising from that work
  • describes how the risks will be controlled, and
  • describes how the risk control measures will be put in place.

An SWMS must be site specific.  While a generic SWMS might be used as a starting point, each SWMS must address the issues that are specific to the site where the work activity will be carried out.  Generic SWMS invariably fail to address issues that are unique to the site in question.  They can lead to accidents which could easily have been avoided by considering the particular aspects of the site in question.

Most important of all, the work should then be done in accordance with the SWMS.  The workers conducting the activity should be:

  • • instructed in how to complete it in accordance with the SWMS
  • • given the appropriate training and instruction and
  • • monitored as appropriate as the activity is carried out.

One SWMS can be prepared to cover a variety of tasks, if it takes into account the changing nature of the work environment.  Alternatively, a separate SWMS can be prepared for each type of hazardous work.  In deciding this, consider situations where different types of hazardous work impact on each other {e.g. moving powered mobile plant close to where formwork is being constructed). READ MORE

Related articles across the web

  • Imagination and Safety
  • When the Safety Tool Becomes the Method
  • How Will Your Job Kill You
  • What is Safety?
  • More Dumb People Are Dying
  • Ten Cautions About Safety Checklists
  • Bio
  • Latest Posts
  • More Info
Barry Spud

Barry Spud

Safety Crusader, BBS Fanatic, Zero Harm Zealot, Compliance Controller and Global Pandemic Expert at Everything Safety
Barry Spud

Latest posts by Barry Spud (see all)

  • Barry Spud’s Hazard Control Tips - August 28, 2020
  • Researchers Reveal the Top 10 Most Effective Safety Slogans Of All Time - July 27, 2020
  • Safety Rules, OK - July 26, 2020
  • Template – Zero Harm Advisor - July 9, 2020
  • Detailed Root Cause Analysis Leads to Industrial Manslaughter Charge - June 9, 2020
Barry Spud

Please share our posts

  • Click to print (Opens in new window)
  • Click to email this to a friend (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to share on Reddit (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)

Related

Filed Under: Work Method Statements Tagged With: swms, Work Method Statements

Reader Interactions

Do you have any thoughts? Please share them below Cancel reply

Primary Sidebar

How we pay for the high cost of running of this site – try it for free on your site

Visit Count – Started Jan 2015

  • 21,279,005 Visitors

Never miss a post - Subscribe via Email

Enter your email address and join over 30,000 other discerning safety people who receive notifications of new posts by email

Please take our 2 minute zero survey

Recent Comments

  • Rob Long on Measurement Anxiety in Safety
  • Antony on Measurement Anxiety in Safety
  • Rob Long on The Quantitative and Qualitative Divide in Safety
  • Bernard Corden on The Quantitative and Qualitative Divide in Safety
  • Bernard Corden on Are You a Safety Clown?
  • Atharva on Road Safety Slogans
  • Rob Long on It’s Always About Paperwork
  • Keith on It’s Always About Paperwork
  • Sairam on Road Safety Slogans
  • Rob Long on Merry Covid Xmas–2020

FREE eBOOK DOWNLOADS

Featured Downloads

  • Too-Much-Safety-eBook-Rev-01.pdf (1427 downloads)
  • Blowin'-in-the-wind-03092019 (415 downloads)
  • WorkSafe_inspectors_guide_FINAL.pdf (393 downloads)
  • Driving Safety (6253 downloads)
  • Supervising Children Around Water (7184 downloads)
  • Volunteer-Risk-Assessment-checklist.pdf (739 downloads)
  • Risk-Homeostasis-Target-Risk-3.pdf (1877 downloads)
  • Zero-to-HRO-08-September-2017.pdf (634 downloads)
  • SAFETYconnect-Flyer.pdf (250 downloads)
  • Health and Safety Risk Assessment Checklist (8150 downloads)
  • SAFETY-SLOGANS-LIST.doc (6586 downloads)
  • Low-Bridges.pps (2148 downloads)
  • Public-Event-Risk-Management-Checklist-HD.doc (2367 downloads)
  • Coronavirus - Covid 19 Toolbox Talk (2577 downloads)
  • "School of Ethics Map" has no version set!

Recent Posts

  • The Seduction of Slogans in Safety
  • Certificate, Diploma and Masters Studies in SPoR
  • Measurement Anxiety in Safety
  • Are You a Safety Clown?
  • The Quantitative and Qualitative Divide in Safety
  • Balance in Risk and Safety
  • It’s Always About Paperwork
  • Sin-Eaters for Safety
  • Mixed Messages but No Redemption
  • The Silver Bullet

Footer

AUTHORS

  • Alan Quilley
    • Heinrich–Industrial Accident Prevention
    • The Problem With ZERO Goals and Results
  • Bernard Corden
    • AHH$ Covid$afe Chri$tma$ New$letter
    • Paradise by the dashboard light
  • Bill Sims
    • Employee Engagement: Chocolate, Vanilla, or Strawberry?
    • Injury Hiding-How do you stop it?
  • Craig Clancy
    • Task Based vs Activity Based Safe Work Method Statements
    • Safety And Tender Submissions
  • Daniel Kirk
    • It’s easy being wise after the event.
    • A Positive Safety Story
  • Dave Whitefield
    • Safety is about…
    • Safety and Compliance
  • Dennis Millard
    • Are You Risk Intelligent?
    • Honey they get me! They get me at work!
  • Drewie
    • Downturn Doin’ Your Head In? Let’s Chat….
    • How was your break?
  • Gabrielle Carlton
    • All Care and No Care!
    • You Are Not Alone!
  • George Robotham
    • How to Give an Unforgettable Safety Presentation
    • How To Write a Safety Report
  • Goran Prvulovic
    • Safety Manager – an Ultimate Scapegoat
    • HSE Performance – Back to Basics
  • James Ellis
    • In search of plan B in workers’ recovery
    • What and how should we measure to support recovery from injury?
  • James Parkinson
    • To laugh or not to laugh
    • People and Safety
  • John Toomey
    • Who is Responsible for This?
    • Who Are Your People?
  • Karl Cameron
    • Abby Normal Safety
    • The Right Thing
  • Ken Roberts
    • Safety Legislation Is Our Biggest Accident?
    • HSE Trip Down Memory Lane
  • Mark Perrett
    • Psychology of Persuasion: Top 5 influencing skills for getting what you want
  • Mark Taylor
    • Build a Psychologically Safe Workplace by Taking Risks and Analysing Failures
    • Enculturing Safety
  • Max Geyer
    • WHS Legislation is NOT about Safety it’s about Culture
    • Due Diligence Is Not Just Ticking Boxes!
  • Matt Thorne
    • It was the SIA until someone wanted to swing from the Chandelier
    • Common Sense is Remarkably Uncommon
  • Peter Ribbe
    • Is there “Common Sense” in safety?
    • Who wants to be a safety professional?
  • Phil LaDuke
    • Hey Idiots, You’re Worried About the Wrong Things
    • Misleading Indicators
  • Admin
    • Certificate, Diploma and Masters Studies in SPoR
    • Merry Covid Xmas–2020
  • Dr Rob Long
    • The Seduction of Slogans in Safety
    • Measurement Anxiety in Safety
  • Rob Sams
    • I’m just not that into safety anymore
    • Social ‘Resiliencing’
  • Barry Spud
    • Barry Spud’s Hazard Control Tips
    • Researchers Reveal the Top 10 Most Effective Safety Slogans Of All Time
  • Sheri Suckling
    • How Can I Get the Boss to Listen?
  • Safety Nerd
    • The Block isn’t portraying safety as it should be
    • Toolbox Talk Show–PPE
  • Wynand Serfontein
    • Why The Problem With Learning Is Unlearning
    • I DON’T KNOW
  • Zoe Koskinas
    • Why is fallibility so challenging in the workplace?

FEATURED POSTS

Data Cannot Drive Vision

Trinket Safety

Conducting a Psychology and Culture Safety Walk

Study at The Centre for Leadership and Learning in Risk

Can There be a Feminist Safety?

Subjecting and Objecting About Risk

What’s Your Resilience Profile?

Human Dymensions Newsletter–Feb 14

Living In Glass Houses

Desensitisation–the by-product of ill-conceived safety initiatives

I Just Don’t Know

Human Dymensions Newsletter September 2016

Evidence, Proof and Paperwork in Safety

Flooding is Dangerous, and I don’t Mean the Water….

Fear of Being-in-the-World

Understanding The Social Psychology of Risk – Prof Karl E. Weick

The Rational, aRational and Irrational in Safety

The Mechanistic Worldview and the Dehumanisation of Risk

Inspirational Safety Ideas

C. G. Jung on Risk and Safety

More Posts from this Category

Paperwork

https://vimeo.com/162034157?loop=0

Due Diligence

https://vimeo.com/162493843?loop=0

loading Cancel
Post was not sent - check your email addresses!
Email check failed, please try again
Sorry, your blog cannot share posts by email.